Tanzania • Bridge Design

Feasibility Study, ESIA, Detailed Engineering Design and Tender Document Preparation for Mtera Dam Bridge and Babati Town Bypass Road

Feasibility Study, ESIA, Detailed Engineering Design and Tender Document Preparation for Mtera Dam Bridge and Babati Town Bypass Road

Feasibility study, ESIA, and detailed design for the New Mtera Dam Bridge (400 m extradosed) and 15.5 km bypass road in Tanzania.

Scope

The project covers the feasibility study, ESIA, detailed engineering design, and tender document preparation for the New Mtera Dam Bridge (a 400 m extradosed structure with 100 m end spans and a 200 m center span) and 15.5 km of bitumen-standard bypass roads.

Approach

Bridge Selection

Determined optimal bridge type and size through discharge calculations and geotechnical data review.

Structural Modeling

Performed detailed structural design of the extradosed bridge using MIDAS Civil software in accordance with TANROADS specifications.

Outcome

Project Documentation

Delivered complete engineering cost estimates, detailed Bills of Quantities, structural drawings, and the full set of draft bidding documents.

Impact Assessment

Completed comprehensive Feasibility and Environmental & Social Impact Assessment (ESIA) reports.

Supporting Project Documentation & Media

Feasibility Study, ESIA, Detailed Engineering Design and Tender Document Preparation for Mtera Dam Bridge and Babati Town Bypass Road — supporting documentation 1

Project Details

Status
Completed
Client
Advanced Engineering Solutions Ltd. (Tanzania)
Partner
Advanced Engineering Solutions Ltd.
Duration
15 months
Completion Year
2020

Key Personnel

  • Essayas Dessalegn

    Project Coordinator and Senior Bridge Engineer

  • Fitsum Abebe

    Senior Structural Engineer

  • Berhanemeskel Maru

    Senior Hydrologist